 Current Projects 
Main Page

Booking 2003-2004 Snow Plowing
Limited accounts available
call NOW!

 

 

 

Removing plaster, and casings/molding(s), damaged wall surfaces down to lathe.
Install new Sheet Rock, Re-install existing trim/casings and new ceiling molding(s),

 

Trim and walls removed 4 29 03.jpg (29767 bytes) Demo walls 1 4 29 03.jpg (30776 bytes) Looking down stairs plaster demo 4 29 03.jpg (36708 bytes) strapping install ceiling 4 29 03.jpg (30735 bytes) Looking down stairs plaster demo 4 29 03.jpg (36708 bytes)
2nd Hall 2nd coated and smoothed .jpg (21888 bytes) Ceiling and walls 2nd coated 5 01 03.jpg (17331 bytes) Looking down 2nd coated walls and ceiling 5 1 03.jpg (15648 bytes) new ceiling hung 4 29 03.jpg (26057 bytes) Walls and ceiling taping and smoothing 4 2003.jpg (23393 bytes)
  walls and ceiling 2nd coated 5 1 03 .jpg (20781 bytes)   walls 2nd coated and smoothed 5 2003.jpg (18830 bytes)  

 

 

 

Street flood, footings washed away,
Temp supports, and new footings and drainage

       
Water erodes and undermines supports.jpg (42268 bytes) Tem support in rs under deck water flood repair job.jpg (44570 bytes) adding temp supports under deck from street water.jpg (42657 bytes) Getting ready to remove and shift load.jpg (44793 bytes)
l s deck stone for drainage.jpg (50298 bytes) Crush stone finish front.jpg (45040 bytes) New footing 2 w new stone slope.jpg (52059 bytes) new stone flow layout l s downhill side.jpg (54258 bytes)

 

To view, click link below 
Current Projects 
Page 2 

Current Projects pg 3

 



 

Front 2nd Floor Soffit Fascia Staging and Repair 

Soffitt missing rs gar side.jpg (40951 bytes) L S Soffitt falling.jpg (50152 bytes) Closeup falling trim gutter l s.jpg (38060 bytes) Visible Damage Gutter and Trim missing.jpg (40758 bytes)
Staging w guard rails soffitt repair job.jpg (40318 bytes) Closeup repair rafters and hangers.jpg (26558 bytes) R S Closeup Union St Gar side.jpg (29611 bytes) Scope of work and repair roff edge.jpg (42671 bytes)
All left side repaired new hangers tiebacks.jpg (38620 bytes)   Finish left side trim and gutter 10 2002.jpg (34912 bytes) Closeup gutter and trim new.jpg (31572 bytes) Front repair complete 10 2002.jpg (38771 bytes)

 

Continue below or,
To view other pages , click link below 

Current Projects 
Page 2 

Current Projects pg 3

 

Rotted porch supports, concrete repair,
new hand rails, stair repair

       
       
       

 

 

Basement Renovations
Floor on sleepers, vinyl, hung ceiling, 
wall board and taping, door repair

Window before framing finished 10 18 02.jpg (36931 bytes) Ready for sheet rock 10 18 02.jpg (26997 bytes) Closet and door frame to unfinished basementn.jpg (32943 bytes) Sub floor on sleepers install 1 10 18 02.jpg (30025 bytes) to 1st floor 10 18 02.jpg (35434 bytes)
window s rock and framed 10 25.jpg (31404 bytes) Sub complete 2 10 18 02.jpg (25299 bytes) Laser Level set up and framing complete.jpg (29700 bytes) ceiling strapping 10 25.jpg (20881 bytes)  
      new walls  installed 10 25.jpg (19017 bytes)  
Exterior to basement door repair before.jpg (29326 bytes)   new door install new sub and walls 10 25.jpg (21851 bytes)  
       


Continue below or,
To view other pages , click link below 

Current Projects 
Page 2 

Current Projects pg 3

 

Post Beam Porch Rotted Main Support and Siding

Job start and layout for new post and supports 6 2002.jpg (43097 bytes) LS Post before 6 02.jpg (36662 bytes) Middle post before 6 02.jpg (44098 bytes) Job start layout  6 02.jpg (43150 bytes) RS concrete needs repair.jpg (49792 bytes)
middle concrete sleve.jpg (47372 bytes) Temps holding well.jpg (42049 bytes) Temps RS and Middle 6 02.jpg (44557 bytes) Temp supports middle 6 02.jpg (22672 bytes) Posts afetr removal.jpg (44066 bytes)
         

 

Window casing and framing replaced 
due to improper flashing and trim work

2nd window trim repair before 10 02.jpg (38286 bytes) Framing rotted lower section 10 02.jpg (46387 bytes) Closeup trim before repair 2002.jpg (32472 bytes)
Ready for framing 10 02.jpg (63049 bytes) Rotted Trim Framing after removal 10 2002.jpg (50899 bytes) Trim and framing shoped primed and finished before install.jpg (26816 bytes)
Placing trim on 1st window 10 02.jpg (39372 bytes) Windows completed with all new trim and lead flashing drip edges.jpg (24891 bytes) Windows finished and lead drip edges cut into brick.jpg (32631 bytes)

 

Did you fill out a customer/job information form yet?????  Check out "Customers"

Customer(s)

JJ Moran Sr Co. Main Directory

This site is being developed and maintained by JJMORAN Sr and Company
Copyright  © 2000, 2001 JJMoran Sr & Co.

 

Return to Top

 

Thanks to MK and Carl

J J Moran Sr and Company
Clinton Mass 01510 
978 368 1559
Ma Toll Free 888 368 1559